广告位
 
Product Search
产品详情
Shrink BOPP Film
Cigarette packaging film, referred to as smoke film, is a high-end BOPP film.
Compared with other ordinary packing film, BOPP film has the advantage of higher transparency, lower haze.
better barrier properties, more uniform thickness, lower sealing temperature, and other characteristics.
PRODUCT DETAILS                                                                                                         
Item BOPP Cigarette Film
MaterialBOPPRoll Widthfrom 180mm to1880mm
Typical thickness20mic, 21mic, 22mic, 23mic, 25micRoll Lengthfrom 100m to 6000m
Core Size1  inch(25.4mm), 3 inch(76.2mm)Shrink Rate 3%-10%
Joint≤1FinishHigh Transparency
MOQ5 tons 
(mixed width available 500mm,600mm,700mm etc.)
Sealing Temperture120  °C
Applicationcigarette packet sealing, tobacco carton sealing, gift wraping

 

  

 

 Features:

 

 1) High transparency and outstanding optical property.

 

 2) Uniform and homogeneous thickness.

 

 3) Superb property of stiffness and rigidness.

 

 4) Tamper evident and anti-counterfeit

 

 5) High shrink rate conducive to excellent packing effect.

 

 6) Low sealing temperature.

 

Technical Data Specifications

 

TDS for Cigarette Bopp Film
Test ItemUnitTypical NumericalTest Method
 Thicknessmicron20GB 6672
Haze%1.15GB 2410
Glossiness%87.5GB 8807
Friction Coefficientin/in 0.23GB 10006
out/out0.22
Thermal ShrinkageMD%3.1GB 12027
TD2.3
Modulus of ElasticityMDN/m²2159DIN 53457-Z
TD 
Tensile StrengthMDN/m²160.5GB 13022
TD295.2
Elongation at BreakMD%164.7GB 13022
TD52.9
Thermal Sealing TemperatureIn/In110HUANYUAN
Out/Out110
Heat Sealing Strength In/InN/15mm2.91120℃
Out/Out3.14
Water Vapor Transmission Rate23℃, 85% RH, 24hrsg/m²1.2ASTM F 1249
38℃, 90% RH, 24hrsg/m²6.8
Oxygen Transmission Rate23℃, 85% RH, 24hrscc/m²850ASTM F 1927
23℃, 0% RH, 24hrscc/m²950
Yieldg/m²18.3HUANYUAN

 

 

 

 

Packing&Shipping

 

BOPP Cigarette Film Rolls are packed by poly film and cardboard then put on pallets, by which they will

be protected from any damages during transport and handling.

Shipping way including sea, land, air, or other ways which are workable for you, and normally the production lead time of 1 40ft container is 15 days

脚注信息